Click the Project Name to view details. Click the column labels to sort. Sorts may be ascending or descending.
Show items per page 

 Closed Projects 1-4 (of 4)  
Project
Project Number
City
State
Bid Due Date
Estimated Cost
Project Name:
East Fork Road at Clear Creek Bridge Replacement
705912 French Gulch CA BID CLOSED
07/22/10
11:00 AM
$800,000-$940,000
Description:
The work, in general, consists of constructing a new single span, 120- foot long cast-in-place post-tensioned box girder bridge over Clear Creek. The new bridge is to be supported on spread footings. The existing bridge is to be removed upon completion of the new bridge. Approach roadway work includes construction of approximately 700 feet of new 2...

Project Name:
2010 Shasta County Culvert Repairs and Replacements Project
706702 Redding CA BID CLOSED
07/15/10
11:00 AM
$240,000-$280,000
Description:
The Work consists, in general, of sliplining repair work and replacement of various culverts in Shasta County.

At sliplining locations the work shall consist of cleaning out the existing pipe, inserting HDPE pipe for the full length and pumping grout into the entire length of the pipe to fill the void between the existing pipe and the new pipe. ...

Project Name:
Various Permanent Road Divisions (2010) and Trinity Mountain Road Overlay
610723 Redding CA BID CLOSED
07/15/10
11:00 AM
$250,000-$300,000
Description:
General Work Description: The Work, in general, includes the following and is more particularly described in the Contract Documents.

PRD No. 1 – AMBER RIDGE
Place approximately 461 tons of asphalt concrete machine seal.

Replace 6 blue fire hydrant reflectors.

PRD No. 2 – BLACKSTONE ESTATES
Place approximately 71 tons of asphalt concrete...

Project Name:
Buzzard Roost Road at Cedar Creek Bridge
703913 Round Mountain CA BID CLOSED
06/10/10
11:00 AM
$900,000-$1,000,000
Description:
The Work, in general, consists of constructing a new three span, 100- foot long cast-in-place reinforced concrete bridge over Cedar Creek. The new bridge is to be supported on spread footings. The existing bridge is to be removed upon completion of the new bridge. Approach roadway work includes construction of approximately 675 feet of new 2-lane r...